Merck Sharp & Dohme – Waste Water Treatment Plant Retrofitting and Mechanical Piping Works

Project Value = US$20.4 million

Low Boiler and High Boiler Lifting

Tandem lift using 2 mobile cranes (500 ton and 200 ton) of High Boiler and Low Boiler into position

High Boiler is a 45ton single piece equipment

A critical project milestone as lift involves

  • Limitation of available Space for Crane setup
  • Lift path involves crossing over operational critical facilities and live lines
  • Effective planning and coordination required for the lift